The GEEPAS Tower project is located in Arjan, Al Barsha. More than 19,793 cubic meters of concrete was poured over a continuous period of 42 hours with 600 plus workers working in multiple shifts round-the-clock. The concrete was delivered by engaging more than 300 Transit Mixers making more than 2500 trips from more than 3 plants to deliver the concrete required for the project. The concrete pouring was carried out by massive installations of 14 concrete pumps on site with an additional 5 pumps on stand-by. More than 3000 tonnes of steel has been used and 150,000 Man Hours have been put into constructing the raft of the building.
PROPERTY FEATURES AND AMENITIES:
■ Modern 1Studio apartment
■ Comfortable 1 bathroom
■ 1 Car Parking space
■ Retail outlets
■ Restaurants and Cafes
■ Outdoor Swimming Pool
■ State of the art Gymnasium
■ Ample parking space
■ Kids Play Area
■ Lounge Area
■ Health Clubs